Per-seat licence tax
Dataverse-backed apps require Power Apps Premium for every user. Cost grows with every new employee.
Power Platform → Code Migration Accelerator
Power Platform Wizard migrates Power Apps, Dataverse and Power Automate into a React, .NET and PostgreSQL stack deployed in your own Azure tenant — with Entra ID SSO preserved.
The problem
Dataverse-backed apps require Power Apps Premium for every user. Cost grows with every new employee.
Model-driven limits, ALM friction, weak testing and version control. Engineering velocity hits a wall.
Business logic trapped in low-code metadata instead of maintainable, owned code.
The solution
Automation handles the repetitive 90–99%. Our engineers handle the parity and integrations that matter.
Standard Power Platform solution package plus canvas source.
Schema → PostgreSQL, flows → Logic Apps, Power Fx → TypeScript / C#, UI → React.
Parity testing, row-level security, Graph API integrations, edge cases.
Azure App Service or Container Apps. You own the code and the data.
| Stay on Power Platform | Migrate with ppwizard | |
|---|---|---|
| End-user app licences | Power Apps Premium per seat | No Premium seat for app users |
| Customisation | Platform constraints | Full code control |
| Hosting | Microsoft ecosystem | Your Azure subscription |
| Long-term TCO | Scales with headcount | Infra + support band |
User → Entra ID → React frontend → .NET API → PostgreSQL, all inside your Azure tenant.
Benefits
Remove or drastically cut Premium seats for app consumers.
Azure consumption + support retainer instead of licence multiplication.
PostgreSQL + API + React. Entra ID handles sign-in.
CI/CD, automated tests, peer code review — the engineering basics.
Your region, your tenant, row-level security carried over from the Power Platform model.
Your application code, not opaque platform metadata.
Savings calculator
Indicative only. Adjust the tier to match your agreement.
What we migrate
Honesty note: Approvals, AI Builder, Power BI and custom plugins are scoped in discovery.
Engagement model
Discovery, automation % report, go / no-go recommendation.
Build, parity testing, cutover. Fixed scope per app.
Bronze / Silver / Gold SLA post go-live.
Available as an Azure Managed Application for governed enterprise deployment.
Contact
Tell us about your Power Platform estate. We respond within two business days.
FAQ
No Power Apps Premium seat is required for end users of the migrated application. Entra ID / Microsoft 365 licences for email and identity may still apply, separately.
Yes. Many clients migrate the highest-cost apps first and leave low-volume internal tools on Power Platform.
Assessment is two to four weeks. A single-app migration is typically six to twelve weeks depending on complexity.
Yes — parity is the contractual acceptance criterion, validated by side-by-side test scripts agreed at the assessment phase.
In your own Azure subscription, in the region you choose. We do not run a multi-tenant SaaS.
We map them in discovery and replace with native SDK calls, Graph API or a small adapter service.
Yes. Full remote delivery across UK and Poland; on-site workshops on request.